September 23, 2008

Another double joist where?

Today's accomplishment - passing the open floor inspection. That's Roberto up top. I didn't mean to cut his head off, but I'm trying not to bug people when I take pictures, and its hard to see what you're doing with the phone. The guy with the plans is the inspector. Harried, but nice enough. Our shared moment of 'dang, that was close' was when the inspector actually broke a block to make sure there was concrete in the hole with the bolt. If you look at yesterday's picture, you see mr. concrete filling the holes at the last minute before the floor was started. Roberto said he has never seen an inspector do that.
The water company came today also, and was setting the meter as I was leaving, so we should have water tomorrow. Temporary electric should happen any day now.
Tomorrow's picture should be exciting. There should be a floor, and the Wonka truck will deliver the concrete for the posts for the porches. Walls might even be started.
A friend at the boy's school is going to give me a number for a goat vet. Bosco just is not getting over his stuffiness.
Posted by Picasa

No comments: