We were scheduled for a septic inspection today, but it got put off to tomorrow. We are on pins and needles, holding our breath and crossing our fingers, nerve-wracked. The inspector doesn't seem to like Rob, Rob threatened to report him to the state, and Rob has built this septic field almost by hand, so for all those reasons it will be a huge relief to pass, but we don't expect to.
Meanwhile, back on the pond - trim is up and being prepped, kitchen counters are in, so is the dishwasher and stove. Bathrooms are tiled, our vanity is set. Shelves are built, doors are hung. Electrical is mostly done, we're still waiting for the AC unit to be set (that was also supposed to be today), and the electric will be run to the house in a day or so. I set up an account for propane, and the gas lines should be run this week. Moving in April seems realistic at this point.